홈페이지> 블로그> Hitachi Automotive Parts Production and R&D Base Settled in Guangzhou

Hitachi Automotive Parts Production and R&D Base Settled in Guangzhou

March 21, 2023


According to a Guangzhou Daily report, on December 5, the signing ceremony for the Hitachi Auto Parts Production and R&D Base project in Guangzhou Zengcheng Economic and Technological Development Zone was held in Guangzhou Building. The project totaled about 1 billion yuan. It was completed and put into operation in March 2013. The annual output value reached 1.5 billion to 2 billion yuan, and the annual tax contribution is about 100 million yuan.



As early as July of this year, Guangzhou Mayor Wan Qingliang was entrusted by Wang Yang, Secretary of the Guangdong Provincial Party Committee, and led a Guangdong economic and trade delegation to Japan to hold the “New Guangzhou·New Business Opportunity” during the “Guangdong Province Pearl River Delta Region and Japan Economic and Trade Cooperation Exchange Conference”. The Japan Promotion Conference settled in Guangzhou from the calendar of auto parts production and R&D base project was the result of the visit to Japan.

It is understood that the first phase of the Hitachi auto parts production and R&D base project in the Zengcheng Economic and Technological Development Zone has recently commenced construction, with a total investment of about RMB 1 billion. It was completed and put into operation in March 2013. At present, the land for the project has been determined, the bidding has been completed and the leveling work has been completed, and the improvement of the surrounding roads has also started simultaneously. The project will build a Hitachi Automotive Systems Co., Ltd. China auto parts production and R&D base. It will research and develop Hitachi’s most competitive auto engine control systems and driving control systems and other core components. The annual output value will reach 1.5 billion yuan. 2 billion yuan, annual tax contribution of about 100 million yuan. After the completion of the first phase of the project, the second phase of the project will be planned and constructed.

Mayor Wan Qingliang of Guangzhou attended the signing ceremony and met with Mr. Touma Tokyu, president of Hitachi Automotive Systems Co., Ltd., who was present at the signing ceremony before signing the contract.



문의하기

Author:

Mr. Liu Keda

이메일:

syzdhx@163.com

Phone/WhatsApp:

+8613904003748

인기 상품
You may also like
Related Categories

이 업체에게 이메일로 보내기

제목:
이메일:
메시지:

Your message must be betwwen 20-8000 characters

문의하기

Author:

Mr. Liu Keda

이메일:

syzdhx@163.com

Phone/WhatsApp:

+8613904003748

인기 상품

Copyright © 2024 Shenyang Zhongda Huanxin Refrigeration Technology Co., Ltd.판권소유

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

송신